October 15th, 2007
October 15th
So I spent yesterday and today finishing the hardwood in the closet and tiling the entrance at the front door. Yesterday and today up to 2pm was all about the prep…I laid 1/4" backerboard, and then screwed it down, then cut cut cut…Note the 5 decorative glass tiles in the centre of the centre row (not sure how to describe…)
I laid the tiles in about 2 hours…One thing I have learned with tiling is that it is getting ready that takes the time…They have not been cleaned or grouted yet…so ignore all the splotches and white stuff (thin set) in between…


Also, started the process to get Rachael and Jackie’s rooms put back together…



Terry took the cabinet, the toilet and the last of the flooring out of the main floor bathroom and mudroom hall for me today…No small task!! This would be the last plywood standing…and if i never see plywood again, that would still be too soon…

I would have taken pictures of the closet, but it has a drop cloth in there bcz Bonnie is painting for me
Wahoo!
I will tomorrow though…