April 27th, 2007
April 27th
Day 3 started at 8am…so a little earlier. I was up and already showered though as I was unsure when the sewer pipe to the tanks would be out of commission. As it happens, it was not cut at all today as they spent a good chunk of the day getting ready to cut the pipe. They had to core drill through the existing foundation where the new exit is going to be…They rented a 4" drill and the pipe was 4 1/4", so they spent a bunch of time chipping at the hole to make it bigger. They did however bust up the electric switch that controls the tank pumps…so while we technically HAVE all the plumbing…we have to use it with caution until the switch is fixed bcz the tanks are not being pumped out to the field, and if they fill up…we are in a bad spot. It will be Monday at the earliest…could be longer. Had a an window place and another electrician out today for quotes…We have to make some of these decisions…particularly the windows as they can take up to 5 weeks to be manufactured. The guys cut out at 6pm today…so a little early HAHA. I am such a mean boss…the jokes are flyin’ about getting me my own hard hat
It will be quiet here for the weekend, but a very aggressive time schedule had been set for next week…so we will see how they do!
Here is what the house looks like from the front street…no pillar, just some fancy 2x4s holding up that porch roof

Here is the house from the side…see what I mean about my poor lawn!



I am excited but very nervous…